heritageimpactassessment.co.uk
Compare

Heritage Collective vs Orion Heritage: Fee, Turnaround, Specialism

Reviewed by
Oliver Wakefield-Smith
Founder, Digital Signet
Last reviewed 22 June 2026 · Refreshed quarterly
Direct answer
Which to choose?

Heritage Collective is the stronger match for residential and small-commercial work in London and Bristol, with quoted fees of £1,200 to £4,500 per HIA and 3 to 5 week turnaround. Orion Heritage is the stronger match for strategic and large-scale work, with quoted fees of £3,500 to £9,000 and 4 to 8 week turnaround. For a Grade II family-home HIA, Heritage Collective. For a strategic residential allocation, Orion.

Comparison table

DimensionHeritage CollectiveOrion Heritage
Typical fee band£1,200 to £4,500£3,500 to £9,000
Typical turnaround3 to 5 weeks4 to 8 weeks
Asset-grade sweet-spotGrade II residential, small commercialGrade II to II*, strategic-scale
In-house archaeology?No (subcontracts)Sub-contracts via CIfA partners
Regional coverageLondon, BristolNational
Accreditation leadRIBA-CA, IHBCIHBC, CIfA

When to prefer Heritage Collective

  • London or Bristol residential cases (saves travel time and cost).
  • Grade II family-home extensions and refurbishments.
  • Cases requiring a RIBA-CA architectural perspective on the statement.
  • Tight planning-clock cases where 3-week delivery is needed.

When to prefer Orion Heritage

  • Strategic residential allocations and mixed-use schemes.
  • Retail-park or infrastructure work with multiple heritage assets in the study area.
  • Cases needing combined archaeology and built-heritage methodology.
  • Major-project work with appeal or inquiry risk.